Villa Including Construction With Builds Up Area Of Ground First Floor, Second Floor, Head Room With Entertainment Room And 2 Car Parking.
Chemical treatment to the soil layer, which is in contact with the foundation and floor structure to kill or prevent the termite’s entry, is known as pre-construction anti-termite treatment.
Anti-termite chemical is applied on the top and sides of the foundation there are 3times, which prevents the entry of termites from all the sides, keeping the foundation safe.
The beam depth required for a span depends on various factors, including the load, material properties, and desired safety margin. One common formula used in structural engineering is the span-to-depth ratio. In general, the size of the beam for a residential building.
Providing and fixing steel reinforcement. Rate includes labor charges for cutting, bending, cranking, fabricating and tying in position steel bars conforming to IS 434 and IS 1786 for RCC works including cost of soft drawn annealed binding wire of not less than 16 gauge, pre cast c.c cover blocks of required thickness, all leads, lifting and handling charges, cost of tools, tackle, scaffolding, wastages, rolling margin etc., complete as per Architect's instructions & detailed specifications/drawings.
Our role doesn’t end even after the home is delivered to you. Even though we build your homes with top notch quality and technology, it might require some maintenance after a while. Therefore, we give a 10-year warranty on structure, 1 year warranty on seepage and a 6 months general warranty and free labour home maintenance the 3 months.
Villa Including Construction With Builds Up Area Of Ground First Floor, Second Floor, Head Room With Entertainment Room And 2 Car Parking.
Providing Antisemite treatment to bottom and sides of foundation, below Plinth area, external perimeter in accordance with IS 6313 stipulations by an approved specialist Team as per Standard specifications and shall carry a guarantee against appearance of the termites for a period of five years including the cost of chemical, precautionary measures, etc. complete.
100% Flowing for the Vasthu Construction. will be consulted with the owner requirements. or will use the standard scales for architectural drawings.
Our role does not end even after the home is delivered to you. Even though we build your homes with top notch quality and technology, it might require some maintenance after a while. Therefore, we give a 15-year warranty on structure, 1 year warranty on seepage and a 6 months general warranty and free Labor home maintenance the 3 months.
Construction Cost Including With Builds Up Area Parking Areaof Ground Floor, First Floor, Second Floor And Head Room With Entertainment Room And 2 Car Parking
Supply, mix, place in position, consolidate and cure plain cement concrete, including preparing surface to receive concrete with necessary cantering/shuttering/formwork whenever required, laid to slope as indicated
100% Flowing for the Vasthu Construction. will be consulted with the owner requirements. or will use the standard scales for architectural drawings.
Our role does not end even after the home is delivered to you. Even though we build your homes with top notch quality and technology, it might require some maintenance after a while. Therefore, we give a 20-year warranty on structure, 1 year warranty on seepage and a 6 months general warranty and free Labor home maintenance the 3 months.
Construction Cost Including With Builds Up Area Parking Areaof Ground Floor, First Floor, Second Floor And Head Room With Entertainment Room And 2 Car Parking
Providing Antisemite treatment to bottom and sides of foundation, below Plinth area, external perimeter in accordance with IS 6313 stipulations by an approved specialist Team as per Standard specifications and shall carry a guarantee against appearance of the termites for a period of five years including the cost of chemical, precautionary measures, etc. complete.